EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
phowe
-
Listing for Category : workshop
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (415)
Research
- (1)
Workshop
- (2)
Empennage
- (2)
Fuselage
- (71)
-
Windshield and Skylight
-
Windshield and Skylight
-
Windshield and Skylight
-
Ribs for Skylight...
-
Rear Fairing
-
Patch Hole in bottom...
-
Doors
-
Doors
-
Tail Station Closeout
-
Belly Fairings
-
Belly Fairings
-
New Header Tank
-
Install windows in...
-
Trimmed Wing...
-
Station 10 and 11...
-
Reattached the boot...
-
Added more rivet...
-
Boot Cowl, Attach...
-
Boot Cowls
-
2 more coats of...
-
Top Boot Cowl Skins...
-
Floorboard
-
Side Boot Cowls
-
Floorboard
-
Bottom Cowl skin
-
Firewall
-
added missing...
-
Installed bottom and...
-
Rivet call outs
-
Taped stringers to...
-
Rivet hole locations...
-
Trimmed the side...
-
Fitted, Trimmed and...
-
Started to fit side...
-
Flipped the fuselage...
-
Cut the stringers...
-
Flipped Fuselage and...
-
Finished riveting...
-
Rivet top skins to...
-
Tailcone skins
-
Tailcone stringers...
-
Front Top Skins
-
Front Tailcone Top...
-
Fitting top skins...
-
Interior - Baggage...
-
Test glued a piece...
-
Edged the bottom of...
-
S4 Closeout
-
S4 Closeout
-
Clecoed top skins to...
-
Edged the Top skins
-
Window Supports (S3...
-
Fabricating window...
-
Drilled the locking...
-
Assembled Rudder pedals
-
Baggage Area
-
Worked on the aft...
-
Rudder pedals
-
Worked on assembling...
-
Work on the Baggage...
-
Rudder cables
-
Tailcone to Fuselage...
-
Cage to tail-cone work
-
Mounting cage to the...
-
Tailcone - riveted...
-
Side and top...
-
Attached the station...
-
Tailcone - riveted...
-
Tailcone - Bottom...
-
Fuselage Stations
Firewall
- (11)
Tail Feathers
- (37)
Wings
- (86)
Controls
- (11)
Avionics
- (30)
Lighting
- (13)
Instrument Panel
- (6)
Landing Gear
- (16)
Engine
- (30)
Propeller
- (7)
Fuel System
- (18)
Interior Finish
- (46)
Rigging
- (6)
Paint / Decals
- (10)
Inspection
Tools
MISC
- (12)
Builder Name:
Philip Howe
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
1711.75
Total Flight Time:
6
Total Expense:
N/A
Start/Last Date:
Oct 19, 2020 - No Finish Date
Engine:
Rotax 915is
Propeller:
Whirlwind
Panel:
Dynon
Friendly URL:
https://eaabuilderslog.org?s=phowe
Home or Last Project Picture
Feb 18, 2022
Clean up
Category: Workshop
The usual Friday ritual before we head home.
Photo Feb 18, 3 05 03 PM.jpg
May 03, 2021
Getting Organized and figuring out where we left off
- (1 hour)
Category: Workshop
We unpacked the crate and looked at the manuals to figure out where we left off. Still ended up spending more time finding parts than we would have liked.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.